DCSIMG

CCR Rule Compliance Data and Information​


Southern Indiana Gas and Electric Company (SIGECO) has established this site for the purpose of posting documentation as required in the EPA's Coal Combustion Residuals rule at 40 CFR Parts 257.105 - 257.107. Beginning on the October 19th, 2015 effective date of the rule, documents will be placed in the operating record as required and subsequently posted to this page within 30 days, or as otherwise required per the compliance deadlines listed in the rule. SIGECO has two generating facilities that are covered by the CCR rule. Information for each site will be listed separately. Please send any inquiries to CCR_Inquiries@centerpointenergy.com​​.


​A.B. Brown Ash​ Pond Closure

The A.B. Brown Ash Pond no longer receives coal combustion materials. A closure plan has been submitted to the Indiana Department of Environmental Management (IDEM). A copy of the initial submitted closure plan is available on this website here A.B Brown Closure Plan_IDEM_11-13-23​ (PDF).

F.B. Culley West Ash Pond Closure

The F.B. Culley West Ash Pond no longer receives coal combustion materials, and has completed closure under the requirements of the Coal Combustion Residuals rule and the Approval of Closure/Post-Closure Plan from IDEM. More information on this project is available at the Indiana Department of Environmental Management Virtual File Cabinet (SW Program ID 87-UP-14).​

257.107 (e) Location Restrictions

Brown Ash Pond

257.60 Placement Above the Uppermost Aquifer (PDF)
257.61 Wetlands (PDF)
257.62 Fault Areas (PDF)
257.63 Seismic Impact Zones (PDF)
257.64 Unstable Areas (PDF)

Brown Landfill

257.64 Unstable Areas (PDF)

Brown Lined CCR Pond

257.60 Placement Above the Uppermost Aquifer (PDF)​
257.61 Wetlands (PDF)
257.62 Fault Areas (PDF)
257.63 Seismic Impact Zones (PDF)
257.64 Unstable Areas (PDF)

Brown Sedimentation Pond​

257.60 Placement Above the Uppermost Aquifer (PDF)
257.61 Wetlands (PDF)
257.62 Fault Areas (PDF)
257.63 Seismic Impact Zones (PDF)
257.64 Unstable Areas​ (PDF) ​

257.107 (f) Design Criteria

257.107 (f)(1) Design Certification for new CCR Landfill or Surface Impoundment

Brown Lined CCR Pond Liner Design Certification (PDF)

257.107 (f)(2) Construction Certification for new CCR Landfill or Surface Impoundment

A.B. Brown Lined CCR Pond Liner Design (PDF)

257.107 (f)(3) Liner Design Certification

A.B. Brown Pond Liner Design (PDF)
A.B. Brown Sedimentation Pond Liner Design (PDF)

257.107 (f)(4) Hazard Potential Classification

Ash Pond: 2021 - Rev 1 | 2021 | 2016
Lined CCR Pond: 2023

257.107 (f)(5) Emergency Action Plan

Ash Pond: A.B. Brown Emergency Action Plan (PDF)
Lined CCR Pond: A.B. Brown Emergency Action Plan (PDF)

257.107 (f)(6) Annual EAP exercise of face to face meeting

2024 | 2023 | 2022 | 2021 | 2020 | 2019 | 2018

257.107 (f)(7) Documentation of EAP Activation

Event ABB 2023-02 | Event ABB 2023-01

257.107 (f)(8) History of Construction for Surface Impoundment

A.B. Brown History of Construction (PDF)

257.107 (f)(9) Structural Stability Assessment for Surface Impoundment

2021 | 2016

257.107 (f)(10) Corrective Measures to remedy deficiency or release

Documentation to be completed as needed

257.107 (f)(11) Safety Factor Assessment for Surface Impoundment

2021 | 2016​ (PDF - 30MB)

257.107 (f)(12) Design and Construction Plans for new Surface Impoundment

Documentation to be completed as needed, and posted prior to initial receipt of CCR.​

257.107 (g) Operating Criteria

257.107 (g)(1) Fugitive Dust Control Plan

2024 | 2023 | 2022 | 2015

257.107 (g)(2) Annual Fugitive Dust Control Report

2023 | 2022 | 2021 | 2020 | 2019 | 2018 | 2017 | 2016

257.107 (g)(3) Run-on and Run-off Control System Plan for Landfill

A.B. Brown Landfill Run-on Run-off Plan (PDF): 2021 | 2016

257.107 (g)(4) Inflow Design Flood Control System Plan for Surface Impoundment

A.B. Brown Pond Inflow Design: 2021-Rev 1 | 2021 | 2016
A.B. Brown Sedimentation Pond Inflow Design: 2021 | 2018
A.B. Brown Lined CCR Pond: 2023

257.107 (g)(5) Annual Inspection Report for Surface Impoundment

Brown Ash Pond Inspections (PDF): 2024 | 2023 | 2022 |  2020 | 2019 | 2018 | 2017 | 2016 | 2015

257.107 (g)(6) Corrective Measures to remedy deficiency noted in inspection report

Brown Ash Pond Inspection Response: 2024 | 2023 | 2022 | 2021 | 2020 | 2019 | 2018 | 2017 | 2016
Brown Landfill Inspection Response: 2024 | 2023 | 2022 | 2021 | 2020 | 2019 | 2018 | 2017 | 2016

257.107 (g)(7) Annual Inspection Report for Landfill

A.B.Brown Landfill Inspections (PDF): 2023 | 2022 | 2021 | 2020 | 2019 | 2018 | 2017 | 2016 | 2015

257.107 (h) Groundwater Monitoring and Corrective Action

257.107 (h)(1) Annual GW Monitoring and Corrective Action Report

Brown Ash Pond Annual Groundwater Report: 20242023 | 2022 | 2022 Addendum | 2021 | 2021 Addendum | 2020 | 2020 Addendum | 2019 | 2019 Addendum | 2018​ | 2018 Addendum
Brown Landfill Annual Groundwater Report: 2024 | 2023 | 2022 | 2022 Addendum | 2021 | 2021 Addendum | 2020 | 2020 Addendum | 2019 | 2019 Addendum | 2018​ | 2018 Addendum
Brown Sedimentation Pond Report: 2024 | 2023 | 2022 | 2022 Addendum | 2021 | 2021 Addendum | 2020 | 2020 Addendum | 2019 | 2019 Addendum | 2018 | 2018 Addendum

257.107 (h)(2) GW Monitoring System Certification

A.B. Brown Ash Pond GW Monitoring System (PDF)
A.B. Brown Landfill GW Monitoring System (PDF)
A.B. Brown Sedimentation Pond GW Monitoring System (PDF)
A.B. Brown Lined CCR Pond GW Monitoring System (PDF)

257.107 (h)(3) GW Monitoring Statistical Method Selection

A.B. Brown Ash Pond GW Monitoring Statistical Certification: Updated 2019 | 2017
A.B. Brown Landfill GW Monitoring Statistical Certification: Updated 2019 | 2017
A.B. Brown Sedimentation Pond GW Monitoring Statistical Certification: Updated 2019 | 2017
A.B. Brown Lined CCR Pond GW Monitoring Statistical Certification: 2023

257.107 (h)(4) GW Assessment Monitoring Program

A.B. Brown Ash Pond Notification of GW Assessment Monitoring Program (PDF)
A.B. Brown Landfill Notification of GW Assessment Monitoring Program (PDF)
A.B. Brown Sedimentation Pond Notification of GW Assessment Monitoring Program (PDF)

257.107 (h)(5) Return to Detection Monitoring

Notification to be completed within 30 days of returning to detection monitoring

257.107 (h)(6) Statistically Significant Level for Appendix IV Parameter

Ash Pond Notification of SSL (PDF)
Landfill Notification of SSL (PDF)

257.107 (h)(7) Initiation of Assessment of Corrective Action

Ash Pond Notification of Initiation of Assessment of Corrective Action (PDF)

257.107 (h)(8) Completion of Assessment of Corrective Measures

A.B. Brown Ash Pond Corrective Measures Assessment Report (PDF)
A.B. Brown Ash Pond Addendum to Corrective Measures Assessment Report (PDF)

257.107 (h)(9) Semiannual Report Describing Progress in Selecting and Designing the Remedy

A.B. Brown Ash Pond Semi-Annual Report - March 2020 (PDF)
A.B. Brown Ash Pond Semi-Annual Report - September 2020 (PDF)
A.A. B. Brown Ash Pond Semi-Annual Report - March 2021 (PDF)
A.B. Brown Ash Pond Semi-Annual Report - September 2021 (PDF)
A.B. Brown Ash Pond Semi-Annual Report - March 2022 (PDF)
A.B. Brown Ash Pond Semi-Annual Report - September 2022 (PDF)
A.B. Brown Ash Pond Semi-Annual Report - March 2023 (PDF)
A.B. Brown Ash Pond Semi-Annual Report - September 2023 (PDF)
A.B. Brown Ash Pond Semi-Annual Report - March 2024​ (PDF)
A.B. Brown Ash Pond Semi-Annual Report - September 2024 (PDF)

257.107 (h)(10) Completion of Remedy

Documentation to be completed as needed​

257.107 (i) Closure and Post Closure Care

257.107 (i)(1) Intent to Initiate Closure for Inactive Surface Impoundment

Documentation to be completed by 12/17/2015

257.107 (i)(2) Annual Progress Report for Inactive Surface Impoundment Closure

Documentation to be completed within 13 months of initial report, and 12 months of 2nd report

257.107 (i)(3) Completion of Inactive Surface Impoundment Closure

Documentation to be completed within 60 days of completing closure

257.107 (i)(4) Written Closure Plan

A.B. Brown Pond Closure Plan (PDF)
A.B. Brown Pond Closure Plan – Updated 2020 (PDF)
A.B. Brown Landfill Closure Plan (PDF)
A.B. Brown Sedimentation Pond Closure Plan (PDF)
A.B. Brown Lined CCR Pond Closure Plan​ (PDF)

257.107 (i)(5) Demonstration of need for Time Extension to Initiate Closure

Documentation to be completed as needed​

257.107 (i)(6) Demonstration of need for Time Extension to Complete Closure

Documentation to be completed as needed

257.107 (i)(7) Intent to Close CCR Unit

A.B. Brown Ash Pond - Notice of Intent to Excavate (PDF)

257.107 (i)(8) Completion of CCR Unit Closure

Notification to be completed within 30 days of completing closure

257.107 (i)(9) Record of Deed Notation

Notification to be completed within 30 days of notating deed

257.107 (i)(10) Intent to Comply with Alternate Closure

Notification to be completed within 6 months of triggering closure

257.107 (i)(11) Annual Progress Report under Alternate Closure

Documentation to be completed as needed

257.107 (i)(12) Post Closure Plan

A.B. Brown Pond Post Closure Plan (PDF)
A.B. Brown Landfill Post Closure Plan (PDF)
A.B. Brown Lined CCR Pond Post Closure Plan (PDF)

257.107 (i)(13) Completion of Post Closure Care

Notification to be completed within 60 days of completing post closure

257.107 (i)(14) Site Specific Alternative to Initiation of Closure Due to Development of Alternative Capacity Infeasible

Notification of Demonstration Submittal (PDF)
Copy of Demonstration (PDF)
Completeness Letter (PDF)
Response to U.S. EPA February 2022 Request for Additional Information (PDF)

257.107 (i)(15) Proposed Determination - Conditional Approval for Site-Specific Alternative to Initiation of Closure

A.B. Brown Ash Pond Proposed Determination - 10-5-2022 (PDF)

257.107 (j) Retrofit Criteria

Documentation to be completeed as needed.
The labels "EAST" and "WEST" in the lists below refer to the East Ash Pond and West Ash Pond, respectively.

West Ash Pond: On July 26, 2016, EPA released the CCR Extensions Rule to address the vacature of 40 CFR § 257.100 which established expemptions for Inactive CCR Surface Impoundments. Units that had declared Inactive status by 12/17/15 under 257.100 (i)(1) must comply with amended deadlines as listed in the Extensions rule.

257.107 (e) Location Restrictions

East

257.60 Placement Above the Uppermost Aquifer (PDF)
257.61 Wetlands (PDF)
257.62 Fault Areas (PDF)
257.63 Seismic Impact Zones (PDF)
257.64 Unstable Areas (PDF)

West

257.60 Placement Above the Uppermost Aquifer (PDF)
257.61 Wetlands (PDF)
257.62 Fault Areas (PDF)
257.63 Seismic Impact Zones (PDF)
257.64 Unstable Areas (PDF)

257.107 (f) Design Criteria

257.107 (f)(1) Design Certification for new CCR Landfill or Surface Impoundment

EAST: Documentation to be completed as needed, and posted within 60 days of commencing construction.
WEST: Documentation to be completed as needed, and posted within 60 days of commencing construction.

257.107 (f)(2) Construction Certification for new CCR Landfill or Surface Impoundment

EAST: Documentation to be completed as needed, and posted prior to initial receipt of CCR.
WEST: Documentation to be completed as needed, and posted prior to initial receipt of CCR.

257.107 (f)(3) Liner Design Certification

EAST: F.B. Culley East Liner Design (PDF)
WEST: F.B. Culley West Liner Design (PDF): Updated 2019 | 2018

257.107 (f)(4) Hazard Potential Classification

EAST: F.B. Culley East Hazard Potential Classification (PDF): 2021 - Rev 1 | 2021 | 2016
WEST: F.B. Culley West Hazard Potential Classification (PDF): Updated 2019 | 2018

257.107 (f)(5) Emergency Action Plan

EAST: F.B. Culley East Emergency Action Plan (PDF)
WEST: F.B. Culley West Emergency Action Plan (PDF): Updated 2019 | 2017

257.107 (f)(6) Annual EAP exercise of face to face meeting

EAST: 2024 (PDF) | 2023 (PDF) | 2022 (PDF) | 2021 (PDF) | 2020 (PDF) | 2019 (PDF) | 2018 (PDF)
WEST: 2021 not applicable - pond closed | 2020 | 2019

257.107 (f)(7) Documentation of EAP Activation

EAST: Event FBC 2023-02 | Event FBC 2023-01
WEST: Documentation to be completed as needed

257.107 (f)(8) History of Construction for Surface Impoundment

EAST: F.B. Culley East History of Construction (PDF)
WEST: F.B. Culley West History of Construction (PDF): Updated 2019 | 2017

257.107 (f)(9) Structural Stability Assessment for Surface Impoundment

EAST: F.B. Culley East Structural Stability Assessment: 2021 | 2016 (PDF)
WEST: F.B. Culley West Structural Stability Assessment (PDF)

257.107 (f)(10) Corrective Measures to remedy deficiency or release

EAST: Documentation to be completed as needed
WEST: Documentation to be completed as needed

257.107 (f)(11) Safety Factor Assessment for Surface Impoundment

EAST: F.B. Culley West Safety Factor Assessment: 2021 - Rev 1 | 2021 | 2016 (PDF - 30MB)
WEST: F.B. Culley West Safety Factor Assessment (PDF)

257.107 (f)(12) Design and Construction Plans for new Surface Impoundment

EAST: Documentation to be completed as needed, and posted prior to initial receipt of CCR.
WEST: Documentation to be completed as needed, and posted prior to initial receipt of CCR.

257.107 (g) Operating Criteria

257.107 (g)(1) Fugitive Dust Control Plan

EAST: F.B. Culley East Dust Control Plan (PDF): 2024 | 2022 | 2018
WEST: F.B. Culley West Dust Control Plan (PDF): Updated 2019 | 2018

257.107 (g)(2) Annual Fugitive Dust Control Report

EAST: F.B. Culley East Fugitive Dust Control (PDF): 2023 | 2022 | 2021 | 2020 | 2019 | 2018 | 2017 | 2016
WEST: F.B. Culley West Fugitive Dust Control (PDF): 2021 | 2020 | 2019 | 2018

257.107 (g)(3) Run-on and Run-off Control System Plan for Landfill

Not applicable

257.107 (g)(4) Inflow Design Flood Control System Plan for Surface Impoundment

EAST: F.B. Culley East Inflow Design (PDF): 2021 - Rev 1 | 2021 | 2017 | 2016
WEST: F.B. Culley West Inflow Design (PDF): 2018​

257.107 (g)(5) Annual Inspection Report for Surface Impoundment

EAST: F.B. Culley East Ash Pond Inspection: 2024 | 2023 | 2022 | 2020 | 2019 | 2018 | 2017 | 2016 | 2015
WEST: F.B. Culley West Ash Pond Inspection: 2020 | 2019 | 2018 | 2017

257.107 (g)(6) Corrective Measures to remedy deficiency noted in inspection report

EAST: F.B. Culley East Inspection Response: 2024 | 2023 | 2022 | 2021 | 2020 | 2019 | 2018 | 2017 | 2016
WEST: F.B. Culley West Inspection Response: 2019 | 2018 | 2017

257.107 (h) Groundwater Monitoring and Corrective Action

257.107 (h)(1) Annual GW Monitoring and Corrective Action Report

EAST: F.B. Culley East Ash Pond Annual GW Report: 2024 | 2023 | 2022 | 2021 | 2020 | 2019 | 2018
WEST: F.B. Culley West Ash Pond Annual GW Report: 2024 | 2023 | 2022 | 2021 | 2020 | 2019

257.107 (h)(2) GW Monitoring System Certification

EAST: F.B. Culley East Ash Pond GW Monitoring System (PDF)
WEST: F.B. Culley West Ash Pond GW Monitoring System (PDF)

257.107 (h)(3) GW Monitoring Statistical Method Selection

EAST: F.B. Culley East Ash Pond GW Monitoring Statistical Certification (PDF): Updated 2019 | 2017
WEST: F.B. Culley West Ash Pond GW Monitoring Statistical Certification (PDF)

257.107 (h)(4) GW Assessment Monitoring Program

EAST: F.B. Culley East Ash Pond Notification of GW Assessment Monitoring Program (PDF)
WEST: F.B. Culley West Ash Pond Notification of GW Assessment Monitoring Program (PDF)

257.107 (h)(5) Return to Detection Monitoring

EAST: Notification to be completed within 30 days of returning to detection monitoring
WEST: Notification to be completed within 30 days of returning to detection monitoring

257.107 (h)(6) Statistically Significant Level for Appendix IV Parameter

EAST: Notification of SSL (PDF)
WEST: Notification of SSL (PDF)

257.107 (h)(7) Initiation of Assessment of Corrective Action

EAST: Notification of Initiation of Assessment of Corrective Action (PDF)
WEST: Notification of Initiation of Assessment of Corrective Action (PDF)

257.107 (h)(8) Completion of Assessment of Corrective Measures

EAST: Culley East Ash Pond Corrective Measures Assessment Report (PDF)
Culley East Ash Pond Addendum to Corrective Measures Assessment Report (PDF)
WEST: Culley West Ash Pond Corrective Measures Assessment Report (PDF)

257.107 (h)(9) Semiannual Report Describing Progress in Selecting and Designing the Remedy

EAST:
F.B. Culley East Ash Pond Semi-Annual Report - March 2020 (PDF)
F.B. Culley East Ash Pond Semi-Annual Report - September 2020 (PDF)
F.B. Culley East Ash Pond Semi-Annual Report - March 2021 (PDF)
F.B. Culley East Ash Pond Semi-Annual Report - September 2021 (PDF)
F.B. Culley East Ash Pond Semi-Annual Report - March 2022 (PDF)
F.B. Culley East Ash Pond Semi-Annual Report - September 2022 (PDF)
F.B. Culley East Ash Pond Semi-Annual Report - March 2023 (PDF)
F.B. Culley East Ash Pond Semi-Annual Report - September 2023 (PDF)
F.B. Culley East Ash Pond Semi-Annual Report - March 2024 (PDF)
F.B. Culley East Ash Pond Semi-Annual Report - September 2024 (PDF)

WEST:
F.B. Culley West Ash Pond Semi-Annual Report - August 2021 (PDF)
F.B. Culley West Ash Pond Semi-Annual Report - February 2022 (PDF)
F.B. Culley West Ash Pond Semi-Annual Report - August 2022 (PDF)
F.B. Culley West Ash Pond Semi-Annual Report - February 2023 (PDF)
F.B. Culley West Ash Pond Semi-Annual Report - August 2023 (PDF)
F.B. Culley West Ash Pond Semi-Annual Report - March 2024​​​ (PDF)
F.B. Culley West Ash Pond Semi-Annual Report - August 2024​​​ (PDF)

257.107 (h)(10) Completion of Remedy

EAST: Documentation to be completed as needed
WEST: Documentation to be completed as needed

257.107 (i) Closure and Post Closure Care

257.107 (i)(1) Intent to Initiate Closure for Inactive Surface Impoundment

EAST: Not applicable
WEST: FB Culley West NOI (PDF)

257.107 (i)(2) Annual Progress Report for Inactive Surface Impoundment Closure

EAST: Not applicable; Inactive category withdrawn by EPA
WEST: Not applicable; Inactive category withdrawn by EPA

257.107 (i)(3) Completion of Inactive Surface Impoundment Closure

EAST: Not applicable; Inactive category withdrawn by EPA
WEST: Not applicable; Inactive category withdrawn by EPA

257.107 (i)(4) Written Closure Plan

EAST: F.B. Culley East Closure Plan (PDF)
F.B. Culley East Closure Plan - Updated (PDF)
WEST: F.B. Culley West Closure Plan (PDF)

257.107 (i)(5) Demonstration of need for Time Extension to Initiate Closure

EAST: Documentation to be completed as needed
WEST: Documentation to be completed as needed

257.107 (i)(6) Demonstration of need for Time Extension to Complete Closure

EAST: Documentation to be completed as needed
WEST: Documentation to be completed as needed

257.107 (i)(7) Intent to Close CCR Unit

EAST: FB Culley East NOI (PDF)
WEST: Not Applicable

257.107 (i)(8) Completion of CCR Unit Closure

EAST: Notification to be completed within 30 days of completing closure
WEST: Notification of Completion of Closure (PDF)

257.107 (i)(9) Record of Deed Notation

EAST: Notification to be completed within 30 days of notating deed
WEST: Environmental Restrictive Covenant (PDF)

257.107 (i)(10) Intent to Comply with Alternate Closure

EAST: Notification to be completed within 6 months of triggering closure
WEST: Notification to be completed within 6 months of triggering closure

257.107 (i)(11) Annual Progress Report under Alternate Closure

EAST: Documentation to be completed as needed
WEST: Documentation to be completed as needed

257.107 (i)(12) Post Closure Plan

EAST: F.B. Culley East Post Closure Plan (PDF)
WEST: F.B. Culley West Post Closure Plan (PDF)

257.107 (i)(13) Completion of Post Closure Care

EAST: Notification to be completed within 60 days of completing post closure
WEST: Notification to be completed within 60 days of completing post closure

257.107 (i)(14) Site Specific Alternative to Initiation of Closure Due to Development of Alternative Capacity Infeasible

EAST:
Notification of Demonstration Submittal (PDF)
Copy of Demonstration (PDF)
Completeness Letter (PDF)
Response to U.S. EPA February 2022 Request for Additional Information (PDF)
Schedule Update - February 2023 (PDF)
WEST: Not Applicable

257.107 (j) Retrofit Criteria

EAST: Documentation to be completed as needed
WEST: Documentation to be completed as needed​