Jordan – Mill Pond Neighborhood


Scheduled Start Date: September 6, 2022

CNP Map of Jordan Mill Pond Neighborhood.jpg


Project Resources

  • If you contact CenterPoint Energy for any questions, please reference the project’s name or number 101943440.


What will CenterPoint Energy do?

From Tuesday, September 6 into October 2022, CenterPoint Energy’s authorized contractors will work in the City of Jordan’s Mill Pond Neighborhood. While Michels Corporation will replace the natural gas mains, connect the natural gas service lines to the new mains, and move any inside meters outside, Q3 Contracting will restore the areas affected by Michels Corporation’s work. 

During this time, lane, parking, and sidewalk closures will occur. Flaggers will be on site helping direct traffic. The crews will work along the following streets:

  • Varner Street from 1st Street W. to Sunset Drive
  • Riverside Lane at Varner Street
  • Park Drive from Sunset Drive to and from 520 Helena St to Hillside Drive
  • Woodland Circle
  • Hillside Drive from Marlane Circle to the cul-de-sac at Helena Boulevard / Broadway Street S.
  • Kipp Drive
  • Hillside Avenue from Hillside Drive to Chad Circle
  • Chad Circle
  • County Road 66 from Hillside Avenue to 209 Robert Road


What if I have an inside gas meter?

The customer will receive a CenterPoint Energy postcard in the mail typically within one or two weeks prior to the day when the Michels Corporation crews will perform the work. The crews will have CenterPoint Energy-authorized photo IDs stating that they are employees of Michels Corporation.

After the customer receives the postcard, the foreman will arrive at the customer’s house to schedule an appointment that typically meets with the customer’s schedule. If the customer isn’t home when they arrive, they will leave a door tag with their contact information to schedule an appointment with them.

Customers are advised to set aside a two- to four-hour time frame for the inside-to-outside gas meter move. They are also advised to mark their privately-installed utilities such as dog fences or sprinklers. Marking can be accomplished with tools such as spray paint or utility flags. The foreman will access the natural gas meter inside the house, move the meter outside, and relight the natural gas appliance pilot lights after the new meter has been relocated.

Customers with outside meters will be notified prior to the replacement or connection of the service lines to the new mains. Areas affected by our work will be restored to their original condition.


What should I expect during restoration?

On the soft surfaces such as boulevards and lawns, various erosion control measures keep the restored area moist, hold seed in the soil, and enhance seed germination. If an erosion blanket is needed it is secured in place with staples. The mesh is a wood fiber that will completely degrade. Prior to mowing the restored area, remove any loose staples that secured the blanket. For photo examples, please visit our Restoration Practices page.