What will CenterPoint Energy do?

From spring to summer 2022, CenterPoint Energy’s authorized contractors will work in Ramsey along the following streets: Bunker Lake Boulevard NW (County Road 116) from Armstrong Boulevard NW (County Road 83) to Town Center Drive; Bunker Lake Boulevard NW from Ramsey Boulevard NW (County Road 56) to Basalt Street NW; and Sunwood Drive NW just west of Bunker Lake Boulevard NW.


While Michels Corporation will replace the natural gas mains, Q3 Contracting will restore the areas affected by Michels Corporation’s work. During this time, lane shifts will occur. Parking may be restricted on the side of the street where the crews are working.

What should I expect during restoration?

On the soft surfaces such as boulevards and lawns, various erosion control measures keep the restored area moist, hold seed in the soil, and enhance seed germination. If an erosion blanket is needed it is secured in place with staples. The mesh is a wood fiber that will completely degrade. Prior to mowing the restored area, remove any loose staples that secured the blanket.