What will CenterPoint Energy do?

In 2020, CenterPoint Energy’s largest project in the Phillips Neighborhood included select streets between Elliot and Longfellow Avenues and between 25th and 31st Streets E. CenterPoint Energy’s authorized contractors replaced small-diameter natural gas plastic mains, connected service lines to the mains, moved inside meters outside, and restored the areas affected by their work outside the limits of the City of Minneapolis’s Street Resurfacing Program.


This spring 2023, CenterPoint Energy’s authorized contractors will work in the Phillips Neighborhood in Minneapolis along 27th Street E. from 15th to 17th Avenues S. While a natural gas contractor will replace a large-diameter natural gas steel main, Q3 Contracting will restore the areas affected by the gas crew’s work. There will be no assessment or cost associated with our work.