Anticipated timeline: Several months beginning Monday, August 5
- If you contact CenterPoint Energy, please reference the project’s work order number 110213411.
Overview
For several months beginning Monday, August 5, CenterPoint Energy’s authorized contractors will work in the Bryn Mawr Neighborhood in Minneapolis to replace the natural gas mains, move inside meters outside by appointment, replace and/or reconnect service lines to the new main, and restore the areas affected by this work. The crews will work along the following streets:
- Washburn Avenue N. from Glenwood Avenue to the cul-de-sac south of Chestnut Avenue W.
- Vincent Avenue N. from Glenwood Avenue to the cul-de-sac south of Chestnut Avenue W.
- Chestnut Avenue W. from Xerxes Avenue S. to Vincent Avenue S.
- Upton Avenue S., starting at Chestnut Avenue W. and working south to Cedar Lake Road S.
- Thomas Avenue S., starting at Chestnut Avenue W. and working south to Cedar Lake Road S.
- Sheridan Avenue S., starting at Chestnut Avenue W. and working south to Laurel Avenue W.
- Russell Avenue S., starting at Chestnut Avenue W. and working south to Laurel Avenue W. and from Mount View Avenue to Wayzata Boulevard
- Queen Avenue S., starting at Chestnut Avenue W. and working south to Laurel Avenue W. and from Mount View Avenue to Wayzata Boulevard
- Laurel Avenue W. from Upton Avenue S. to Sheridan Avenue S.
- Cedar Lake Road S. from Sheridan Avenue S. to Morgan Avenue S.
- Mount View Avenue from Wayzata Boulevard to Oliver Avenue S.
- Oliver Avenue S. from Morgan Avenue S. to the cul-de-sac south of the railroad tracks
- Newton Avenue S. from Mount View Avenue to the railroad tracks
- Morgan Avenue S. from Mount View Avenue to Cedar Lake Road S.
Equix Integrity updates our records on the locations of sewer lines in relation to natural gas lines. Michels Corporation will replace the natural gas plastic mains, move inside meters to the outside of homes by appointment, and replace and/or reconnect natural gas service lines. Q3 Contracting will restore the areas affected by Michels Corporation’s work. There will be no assessment or cost associated with our work.
Marking utilities
CenterPoint Energy will contact Gopher State One Call 811 to locate public underground utilities such as water, sewer, and cable. You will see markings such as spray paint and utility flags. They will be color-coordinated to indicate a separate utility.
If you have installed any private lines such as sprinklers or dog fences, we ask that you mark them with whatever material is convenient for you. Examples include spray paint, flags, and wooden sticks used to stir paint. Marking sprinkler heads is sufficient.
If any utility flags are left in residents’ yards after the natural gas work and the restoration work is done, and the crew do not remove the flags, residents can remove the flags and throw them away.
Natural gas main work
The crew plans to bore the main underneath one sidewalk on each road. Please keep in mind that some intersections or some sidewalk panels at intersections may not be permanently restored until after the service line work is done. After all customers’ service lines are transferred to the new main, the crew can connect the new main to the existing intersecting mains and put the new main into service. Then the restoration crew will permanently restore these areas. Until then, customers may see temporary backfill such as dirt or gravel. We thank you for your patience!
Service line and meter work
The customer will receive a CenterPoint Energy postcard in the mail before the natural gas crews perform the work. The crews will have CenterPoint Energy-authorized photo IDs. After the customer receives the postcard, the technician will arrive at the customer’s house to schedule an appointment that typically meets with the customer’s schedule. If the customer isn’t home when they arrive, they will leave a door tag with their contact information to schedule an appointment with them.
One natural gas crew typically works on about one block per week. They will either fully replace the service line or reconnect it to the new main, depending on the line’s age. For most properties, the crews remove at least one sidewalk panel in front of the house, excavate a hole by the outside meter, and bore the service line from the sidewalk to the house.
For inside meters, the crew will make a two- to three-hour appointment at a time that works with the resident. We encourage customers to work with the crew on where they want the meter to go, keeping limitations in mind such as a minimum of three feet away from areas such as windows, doors, and vents. Customers with outside meters will be notified prior to the replacement or connection of the service lines to the new mains.
The technician will access the natural gas meter inside the house, move the meter outside, and relight the natural gas appliance pilot lights after the new meter has been relocated.
Restoration
After the service line and meter work, the gas crew will backfill the excavated areas with dirt or gravel. This will be temporary before the restoration crew comes. On boulevards and lawns, they will refill the areas with black dirt, grass seed, and netting that degrades over about four months. Prior to mowing the restored area, remove any loose staples that secured the netting. For photo examples, please visit our
Restoration Practices page.