Minneapolis – Beltrami Neighborhood


Anticipated timeline: several months starting Monday, April 10

  • If you contact CenterPoint Energy, please reference the project’s number 106200789.

CNP Map of Minneapolis Beltrami Neighborhood.png
 
 

Overview

For several months starting Monday, April 10, CenterPoint Energy’s authorized contractors will work in the Beltrami Neighborhood in Minneapolis.

On the following streets, the crews will work on the natural gas mains, service lines, and meters:

  • Pierce Street NE from 13th to 14th Avenues NE
  • Buchanan and Lincoln Streets NE from Broadway Street NE to 14th Avenue NE
  • 12th Avenue NE from Buchanan to Lincoln Streets NE
  • 14th Avenue NE from Pierce to Buchanan Streets NE

On the following streets, the crews will work only the service lines and meters:

  • Fillmore Street NE from 17th to 18th Avenues NE
  • About a dozen homes in the corner from Broadway Street NE to the railroad on Fillmore, Pierce, and Buchanan Streets NE
  • Monroe Street NE from Broadway Street NE to Spring Street NE
  • 2nd Avenue SE from 7th to 8th Streets SE
  • Tyler Street NE from Broadway to Summer Streets NE
  • Polk Street NE from Broadway to Spring Streets NE
  • Taylor Street NE from Summer to Spring Streets NE
  • Fillmore Street NE from Broadway to Winter Streets NE
  • Pierce Street NE from Broadway to Winter Streets NE
  • Buchanan Street NE from Broadway Street NE to Hennepin Avenue
  • Lincoln Street NE from Winter Street NE to Hennepin Avenue

Equix Integrity will update our records on the locations of sewer lines in relation to natural gas lines. A natural gas contractor will replace a natural gas main, move inside meters to the outside of homes, and replace or reconnect service lines as needed. Q3 Contracting will restore the areas affected by the gas crew’s work outside the limits of the City of Minneapolis’s work. There will be no assessment or cost associated with our work.


Marking utilities

CenterPoint Energy will contact Gopher State One Call 811 to locate public underground utilities such as water, sewer, and cable. You will see markings such as spray paint and utility flags. They will be color-coordinated to indicate a separate utility.

If you have installed any private lines such as sprinklers or dog fences, we ask that you mark them with whatever material is convenient for you. Examples include spray paint, flags, and wooden sticks used to stir paint. Marking sprinkler heads is sufficient.


Small-diameter natural gas plastic main work

One crew will replace the small-diameter natural gas main. They plan to bore it underneath a sidewalk. Another crew will follow to work on the service lines and meters.

Please keep in mind that some intersections or some sidewalk panels at intersections may not be permanently restored until after the service line work is done. After all customers’ service lines are transferred to the new main, the crew can connect the new main to the existing intersecting mains and put the new main into service. Then the restoration crew will permanently restore these areas. Until then, customers may see temporary backfill such as dirt or gravel. We thank you for your patience!


Service line and meter work

The customer will receive a CenterPoint Energy postcard in the mail explaining the project before the natural gas crews perform the work. The crews will have CenterPoint Energy-authorized photo IDs. After the customer receives the postcard, the foreman will arrive at the customer’s house to schedule an appointment that typically meets with the customer’s schedule. If the customer isn’t home when they arrive, they will leave a door tag with their contact information to schedule an appointment with them.

One natural gas crew typically works on about one block per week. They will either fully replace the service line or reconnect it to the new main, depending on the line’s age. For most properties, the crews remove at least one sidewalk panel in front of the house, excavate a hole by the outside meter, and bore the service line from the sidewalk to the house.

For inside meters, the crew will make a two- to three-hour appointment at a time that works with the resident. We encourage customers to work with the crew on where they want the meter to go, keeping limitations in mind such as a minimum of three feet away from areas such as windows, doors, and vents. Customers with outside meters will be notified prior to the replacement or connection of the service lines to the new mains.

The technician will access the natural gas meter inside the house, move the meter outside, and relight the natural gas appliance pilot lights after the new meter has been relocated.


Restoration

After the service line and meter work, the gas crew will backfill the excavated areas with dirt or gravel. This will be temporary before the restoration crew comes. On boulevards and lawns, they will refill the areas with black dirt, grass seed, and netting that degrades over about four months. Prior to mowing the restored area, remove any loose staples that secured the netting. For photo examples, please visit our Restoration Practices page.

We hope to minimize the disruption as much as possible. Thank you in advance for your patience and understanding as we replace our infrastructure. We wish you a great season.